With load-shedding leaving us in the dark there is no reason for us to be in the dark. Here is some practical point we need to develop to have effective asset Care and performance management

 Wish List

  • Ask all of your team members, including in-house customers, what they want the engineering or maintenance department to do while the plant or building is down. The list will be exhaustive, but it is a good place to gather the tasks that are on their minds. Then prioritize the list with management’s assistance. You will need some assistance to shorten the list. Remember, items on the list must be realistic and doable.

Rough Plan

  • Using the revised list, put together a rough idea of the scope of work. This will help you to decide whether you have enough time to complete the task and when you will do it in-house or contract out the work

Forecast and Budget

  • Determine the amount of money you need for the outage and complete a rough scope of work and an order-of-magnitude cost estimate. Get it approved before you waste time planning something that might not happen. Once you have approval for the order of magnitude cost estimate, you can begin to seek quotes and start the bidding process for the more complex and outsourced tasks.
  • Develop detailed plans for each approved task. Define the parts, supplies, and labour requirements needed. Plan carefully, if your outage window is only a few days, then every minute and hour are critical to success.

Identify Asset Needs

  • Define needed special equipment, such as tools, lifts, generators, and lift trucks.
  • If you work on a large campus, consider whether you need extra transportation, such as golf carts or bicycles.
  • Determine if you need to rent extra generators, compressors, portable lighting, and lifts in the case of power outages.

Contractors

  • Do you need extra contractors to assist with the workload?
  • When doing the initial planning and cost estimating, it’s important to determine where the manpower will come from.
  • Let contractors do the tasks they are best at from a cost, timing, and quality perspective.

Schedule

  • Managers need to schedule each work task by the hour, shift, and day. This is the only way to prevent conflicts, such as the lights going out.
  • It is best to use some type of software. It is a great way to begin the scheduling process, and it’s a great assistance during the outage to assist when things go wrong, which we all know they will.

Plan for Contingencies

  • Not everything will go smoothly. Go through the “what if” drill, and be prepared. If the task is critical to the daily operation after the outage is over, then you must have a backup plan just in case. If your lack of planning impacts too many planned outages, you will be seeking other opportunities pretty fast.

Do Pre-shutdown Work

  • Perform as much work as possible before the outage. The more workers do ahead of time, the more time will be available to complete more tasks. Managers often overlook this step. Ask you team and your contractors what can be done before the outage. They might mention tasks such as bending conduit, welding fittings on sticks of pipe, staging parts in the work area, beginning the demolishing process if it won’t impact the operation, and making sure all rented equipment is onsite ahead of schedule.

Manage the Shutdown

  • If the outage is large and complicated, consider having at least two meetings a day.
  • In the morning, ask what happened last night. Then ask what’s planned for today.
  • In the afternoon, ask what happened today and what’s planned for tonight.
  • Clear communication is critical while the outage is progressing. Make sure contractors attend the meetings with a copies of their project timelines.

Conduct a Post Mortem

  • The week after the outage is the time to complete the autopsy. Discuss and document what went well and what needs improvement for the next outage. Remember, the first planning meeting for your next outage should start the day after the last outage was completed.